Skip to main content

Engineering Change Orders

An engineering change order (ECO) is a change to a previously EAC-certified voting system’s hardware, documentation, or data that is minor in nature and effect. ECOs require voting system test laboratory review and endorsement as well as EAC approval. Any proposed change that is not deemed to be a minimal change is a modification and must be submitted for testing and review consistent with the EAC Testing and Certification Program requirements.

Search by:

Filter by:

Manufacturer

ECO Sort descending Manufacturer Short Name Testing Lab (indexed field) Impacted Device/System (indexed field) Date Approved
CBG-117 Clear Ballot Group, Inc. Pro V&V

ClearVote 2.3 / Dell PowerEdge Server R440

05-05-2023
CBG-191 Clear Ballot Group, Inc. Pro V&V

 ClearVote 2.2, EMS

11-02-2022
CBG-194 Clear Ballot Group, Inc. Pro V&V

ClearVote 2.3, EMS

11-22-2022
Clear Ballot SW13406 Clear Ballot Group, Inc. Pro V&V

ClearCast Go Version 2.2.a and ClearCast Model D Version 2.2.9

03-10-2023
COTS-13 Clear Ballot Group, Inc. Pro V&V

ClearVote 2.3 DesignStation, CountStation, and ScanStation

05-12-2023
COTS-97 Clear Ballot Group, Inc. Pro V&V

ScanServer on ClearVote 2.3

04-12-2023
DVS - 100755 Dominion Voting Systems Corp Pro V&V

This product can be used with the following EAC certified Democracy Suite (D-Suite) systems: 5.5, 5.5-A, 5.5-B, 5.5-C

 

06-21-2021
DVS - 100756 Dominion Voting Systems Corp Pro V&V

This product can be used with the following EAC certified Democracy Suite (D-Suite) systems: 5.5, 5.5-A, 5.5-B, 5.5-C

 

06-21-2021
DVS -100803 Dominion Voting Systems Corp Pro V&V

EAC certified D-Suite systems: 5.5-B, 5.5-C

 

01-26-2022
DVS 100833 Dominion Voting Systems Corp Pro V&V

Imagecast X on D-Suite 5.5, 5.5-A, 5.5-B, 5.5-C

04-21-2022
DVS 100849 Dominion Voting Systems Corp Pro V&V

ImageCast Precinct 2, on D-Suite 5.5-B and 5.5-C

05-16-2022
DVS 100864 Dominion Voting Systems Corp Pro V&V

All D-Suite configurations - Election Management System

07-06-2022
DVS-100368 Dominion Voting Systems Corp

ImageCast Evolution (PCOS-420A)

11-15-2019
DVS-100429 Dominion Voting Systems Corp Pro V&V

ImageCast Central

03-28-2018
DVS-100441 Dominion Voting Systems Corp

4.14-D EMS; 4.14-E EMS

11-19-2018
DVS-100459 Dominion Voting Systems Corp Pro V&V

Democracy Suite ImageCast Evolution

12-10-2018
DVS-100494 Dominion Voting Systems Corp Pro V&V

ImageCast X Classic - All models

12-10-2018
DVS-100500 Dominion Voting Systems Corp Pro V&V

ImageCast X Prime - Democracy Suite 5.5, 5.4-NV, 5.4-Complete, 5.4-E, and 5.4-F

12-17-2018
DVS-100502 Dominion Voting Systems Corp Pro V&V

ImageCast Voter Activation, Mobile Ballot Printing, Results Transfer Manager - Democracy Suite 5.2-CA

12-18-2018
DVS-100503 Dominion Voting Systems Corp Pro V&V

ImageCast Precinct PCOS-320A, -320C, -321C - Democracy Suite

12-17-2018
DVS-100504 Dominion Voting Systems Corp Pro V&V

ImageCast X Classic BMD - Democracy Suite

11-26-2018
DVS-100521 Dominion Voting Systems Corp Pro V&V

EMS

03-18-2019
DVS-100527 Dominion Voting Systems Corp Pro V&V

ImageCast Voter Activation, Mobile Ballot Printing, Results Transfer Manager - Democracy Suite 5.2 and Higher System Configuration

03-25-2019
DVS-100531 Dominion Voting Systems Corp Pro V&V

ImageCast X Prime B1R Tablet

03-18-2019
DVS-100534 Dominion Voting Systems Corp Pro V&V

D-Suite 5.5, 5.5-A, 5.4-NV, 5.4-Complete, 5.4-E, and 5.4-F

03-18-2019
DVS-100535 Dominion Voting Systems Corp Pro V&V

ImageCast X Classic BMD (15 in. and 21 in.)

02-26-2019
DVS-100543 Dominion Voting Systems Corp Pro V&V

D-Suite: 4.14-D, 4.14-E, 5.0, 5.0-A, 5.5, 5.5-A

03-18-2019
DVS-100549 Dominion Voting Systems Corp Pro V&V

EMS, ADJ, ICL - Democracy Suite

04-24-2019
DVS-100565 Dominion Voting Systems Corp Pro V&V

ImageCast X, ImageCast Central - D-Suite-5.0, 5.5

05-15-2019
DVS-100588 Dominion Voting Systems Corp Pro V&V

ImageCast X - D-Suite 5.5

07-22-2019