Skip to main content
Need voter registration information? Visit Vote.gov

DVS-100543

Testing Lab
Impacted Device/System

D-Suite: 4.14-D, 4.14-E, 5.0, 5.0-A, 5.5, 5.5-A

Date Approved by EAC
03/18/2019
Short Description of Changes

A new variant of Canon DR-G 1130 Scanner was added for ICC. The new variant has an updated LCD display panel and interface buttons. The number of buttons and the functions operated by the buttons on Operation Panel remain the same; however, the shape of t

Additional Documentation