Skip to main content
Need voter registration information? Visit Vote.gov

DVS-100531

Testing Lab
Impacted Device/System

ImageCast X Prime B1R Tablet

Date Approved by EAC
03/18/2019
Short Description of Changes

The manufacturer (A value) has modified their tablet product (HID-21 V-BTX-BlR) by changing the "Phoenix-style" terminal block header connector, which provides DC power to external devices attached to the tablet, to a DIN connector. The A value tablet pro

Additional Documentation