Engineering Change Orders

An engineering change order (ECO) is a change to a previously EAC-certified voting system’s hardware, documentation, or data that is minor in nature and effect. ECOs require voting system test laboratory review and endorsement as well as EAC approval. Any proposed change that is not deemed to be a minimal change is a modification and must be submitted for testing and review consistent with the EAC Testing and Certification Program requirements.

Search by:

Filter by:

Manufacturer

ECO Manufacturer Short Name Testing Lab (indexed field) Impacted Device/System (indexed field) Date Approved Sort descending
DVS-100831 Dominion Voting Systems Corp Pro V&V

EMS Client Workstation and ADJ Client Workstation on D-Suite 5.5, 5.5-A, 5.5-B, 5.5-C

04-28-0022
UNS-1001 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc)

Made changes to the following parts: 512 MB DDR Memory Module, 80 GB Hard Drive, and USB Flash Drive: DDR Memory Module andHard Drive wer added to the approved list because of being more readily available currently. Flash drive more ESD resistant case was added.

05-17-2010
UNS-16842 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc)

Removed "EAC APPROVED" and moved "UNISYN" logo to center on OVO and OVI label.

05-24-2010
UNS-16847 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc)

Updated AC distribution cable

05-24-2010
UNS-16855 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc)

Printer, Star TSP743II-24, Serial Interface, Gray, OVI - new flash ROM supplier forced a change to the mainboard and a change to the firmware.

11-30-2010
UNS-16856 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc)

OVI label change

11-30-2010
UNS-16857 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc)

Network seal, plate printer mount, bottom chassis, bracket lock/seal cover, hinge chassis - to alleviate interferences and to accomplish an overall better intercomponent fit and easy of assembly.

11-30-2010
UNS-16858 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc)

Changes in labels for TM and USB flash drive - revision made to documentation for ease of tracking.

11-30-2010
UNS-16859 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc)

OVI ADA Keypad - wrong base material called out on ADA keypad (Part Number 8063-93018).

11-30-2010
ESS-683 Election Systems & Software, Inc (ES&S) NTS Huntsville (formally Wyle Laboratories)

DS200 Scanner

05-10-2011
ESS-819 Election Systems & Software, Inc (ES&S)

DS200 Scanner, Emergency Bin

05-10-2011
ESS-821

DS200 Scanner

05-10-2011
ESS-702

DS200 Scanner

06-16-2011
UNS-16844 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc)

Make changes to BOM and riase Rev. from A to B. The replacement motherboard had been granted a CE Declaration of Conformity for testing that was comparable to that required by the EAC 2005 VVSG.

08-22-2011
UNS-16865 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc)

Add missing EAC label - the BOM for the affected units are missing the EAC label.

08-26-2011
UNS-16870 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc)

Changes were made to various documents/part numbers due to multiple reasons such as: scanner mounting plate hole mismatch, clearance RJ45 connector too small, hinge pins not sufficiently secured, and clearances too small.

09-29-2011
UNS-16871 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc)

Deleted spacers and changed BOM - the four spacers under the motherboard wer eliminated; therefore, the BOM had to be changed and the assembly drawing revised.

09-29-2011
UNS-16869 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc)

Change in motherboard - 2.0GHz motherboard for OVO PC no longer available. Decision made to use the same motherboard for OVO and OVI PC's.

05-18-2012
DVS-100429 Dominion Voting Systems Corp Pro V&V

ImageCast Central

03-28-2018
UNS-16979 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) Pro V&V

OVS 2.0.A (Freedom Vote Tablet)

07-05-2018
DVS-100441 Dominion Voting Systems Corp

4.14-D EMS; 4.14-E EMS

11-19-2018
DVS-100504 Dominion Voting Systems Corp Pro V&V

ImageCast X Classic BMD - Democracy Suite

11-26-2018
DVS-100459 Dominion Voting Systems Corp Pro V&V

Democracy Suite ImageCast Evolution

12-10-2018
DVS-100494 Dominion Voting Systems Corp Pro V&V

ImageCast X Classic - All models

12-10-2018
ESS-996 Election Systems & Software, Inc (ES&S) Pro V&V

EVS (DS450 component)

12-12-2018
ESS-983 Election Systems & Software, Inc (ES&S) Pro V&V

DS200, Hardware 1.3.10.0

12-14-2018
ESS-1004 Election Systems & Software, Inc (ES&S) Pro V&V

EVS (DS450 Component)

12-14-2018
ESS-1005 Election Systems & Software, Inc (ES&S) Pro V&V

EVS (DS850 Component)

12-14-2018
DVS-100500 Dominion Voting Systems Corp Pro V&V

ImageCast X Prime - Democracy Suite 5.5, 5.4-NV, 5.4-Complete, 5.4-E, and 5.4-F

12-17-2018
DVS-100503 Dominion Voting Systems Corp Pro V&V

ImageCast Precinct PCOS-320A, -320C, -321C - Democracy Suite

12-17-2018