HRT-01679

Tuesday, April 29, 2025
Manufacturer
Impacted Device/System

Verity Voting 2.7

Date Approved by EAC
04/29/2025
Short Description of Changes

This ECO accommodates the End-of-Life (EOL) of the roller used for maintenance of the PageScan4 scanner mechanism.

Additional Documentation

ESS-1186

Wednesday, April 23, 2025
Testing Lab
Impacted Device/System

EVS 6.4.0.0, EVS 6.3.0.0 , EVS 6.5.0.0 

Date Approved by EAC
04/23/2025
Short Description of Changes

This minor change introduces a change to the seal lock loop rivet of the DS300 Ballot Box and does not alter the system’s reliability, functionality, capability, or operation. Based on the information provided, it has been determined that no further testing is necessary. 

Additional Documentation

CBG-4112

Wednesday, April 23, 2025
Testing Lab
Impacted Device/System

ClearVote 2.3

Date Approved by EAC
04/23/2025
Short Description of Changes

This minor change adds the Dell OptiPlex XE4 device as a COTS ScanStation to ClearVote 2.3 due to the end of production life status for the current model (Dell Optiplex XE3) and does not alter the system’s reliability, functionality, capability, or operation. Based on the information provided, it has been determined that no further testing is necessary. 

Additional Documentation

DVS-101047

Thursday, August 07, 2025
Testing Lab
Impacted Device/System

Cisco 8-Port Managed Switch (C1300-8T-E-2G) for Democracy Suite 5.17 & Democracy Suite 5.20

Date Approved by EAC
08/07/2025
Short Description of Changes

This updated Engineering Change Order (ECO) supersedes the original submission of DVS-101047 and incorporates revised documentation and VSTL analysis to correct clerical errors and omissions. The change involves replacing the commercially unavailable Cisco CBS350-8T-E-2G with the Cisco 8-Port Managed Switch (C1300-8T-E-2G) as a new COTS component. All VSTL revisions (Rev. 00 through Rev. 02) are posted for full transparency. These updates are clerical in nature and do not impact the system’s reliability, functionality, capability, or operation.

DVS-101046

Friday, April 11, 2025
Testing Lab
Impacted Device/System

Cisco 24-Port Managed Switch (C1300-24T-4G) for Democracy Suite 5.17 & Democracy Suite 5.20.

Date Approved by EAC
04/11/2025
Short Description of Changes

This ECO is a minor change that involves the inclusion of the Cisco 24-Port Managed Switch (C1300-24T-4G) as a new COTS component replacing its predecessor, Cisco CBS350-24T-4G. The change does not impact the system’s reliability, functionality, capability, or operation.

Additional Documentation

Unisyn ECO 1031

Friday, April 11, 2025
Testing Lab
Impacted Device/System

OpenElect 2.2 

Date Approved by EAC
04/11/2025
Short Description of Changes

Adds an 8GB USB drive to be used as a direct replacement for currently certified 1GB USB. This Changes the file system on USB from FAT16 to FAT32 to accommodate larger size.

Additional Documentation
Board of Advisors

2025 EAC Board of Advisors Annual Meeting

The EAC’s Board of Advisors will host an in-person public meeting on May 5 - 6, 2025, in Washington, DC.
Start Time
Monday, May 05, 2025 9:00 AM
End Time
Tuesday, May 06, 2025 11:45 AM
Local Leadership Council (LLC)

2025 EAC Local Leadership Council Annual Meeting

The EAC's Local Leadership Council will hold an in-person public meeting in Charlotte, North Carolina, on April 21-22, 2025.
Start Time
Monday, April 21, 2025 1:00 PM
End Time
Tuesday, April 22, 2025 4:30 PM
Subscribe to