Skip to main content
Need voter registration information? Visit Vote.gov

Engineering Change Orders

Tuesday, December 23, 2025
An engineering change order (ECO) is a change to a previously EAC-certified voting system’s hardware, documentation, or data that is minor in nature and effect. ECOs require voting system test laboratory review and endorsement as well as EAC approval. Any proposed change that is not deemed to be a minimal change is a modification and must be submitted for testing and review consistent with the EAC Testing and Certification Program requirements.

Engineering Change Orders

Search by:

Filter by:

Manufacturer

ECO Manufacturer Testing Lab Impacted Device/System Date Approved
MVT-140 MicroVote General Corp. Pro V&V

Impacted Device:

Dell Latitude 3540, Dell Latitude 3550



Impacted System:

MicroVote EMS 4.41

09-10-2025
SW-7679 Clear Ballot Group, Inc. Pro V&V

ClearVote 1.5, 2.0

08-27-2020
SW7679 Clear Ballot Group, Inc.

ClearVote 1.5, 2.0, and 2.1 (ClearDesign, ClearAccess, and ClearCount components

08-27-2020
Unisyn ECO 1031 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) Pro V&V

OpenElect 2.2 

04-11-2025
UNS-1001 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc)

Made changes to the following parts: 512 MB DDR Memory Module, 80 GB Hard Drive, and USB Flash Drive: DDR Memory Module andHard Drive wer added to the approved list because of being more readily available currently. Flash drive more ESD resistant case was added.

05-17-2010
UNS 1025 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) Pro V&V

OpenElect 2.2 

02-24-2022
UNS 1026 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) Pro V&V

OpenElect 2.2 - Freedom Vote Scan

02-24-2022
UNS 1027 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) Pro V&V

OpenElect Freedom Vote Scan

07-26-2022
UNS-1028 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) Pro V&V

FVS

OpenElect 2.2

OpenElect 2.2.3

07-06-2023
UNS 1029 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) Pro V&V

FreedomVote Scan (FVS) using OpenElect 2.2 and 2.2.3

07-20-2023
UNS 1030 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) Pro V&V

FreedomVote Scan with OpenElect 2.2. and 2.3

09-26-2023
UNS-16842 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc)

Removed "EAC APPROVED" and moved "UNISYN" logo to center on OVO and OVI label.

05-24-2010
UNS-16844 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc)

Make changes to BOM and riase Rev. from A to B. The replacement motherboard had been granted a CE Declaration of Conformity for testing that was comparable to that required by the EAC 2005 VVSG.

08-22-2011
UNS-16847 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc)

Updated AC distribution cable

05-24-2010
UNS-16855 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc)

Printer, Star TSP743II-24, Serial Interface, Gray, OVI - new flash ROM supplier forced a change to the mainboard and a change to the firmware.

11-30-2010
UNS-16856 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc)

OVI label change

11-30-2010
UNS-16857 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc)

Network seal, plate printer mount, bottom chassis, bracket lock/seal cover, hinge chassis - to alleviate interferences and to accomplish an overall better intercomponent fit and easy of assembly.

11-30-2010
UNS-16858 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc)

Changes in labels for TM and USB flash drive - revision made to documentation for ease of tracking.

11-30-2010
UNS-16859 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc)

OVI ADA Keypad - wrong base material called out on ADA keypad (Part Number 8063-93018).

11-30-2010
UNS-16865 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc)

Add missing EAC label - the BOM for the affected units are missing the EAC label.

08-26-2011
UNS-16869 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc)

Change in motherboard - 2.0GHz motherboard for OVO PC no longer available. Decision made to use the same motherboard for OVO and OVI PC's.

05-18-2012
UNS-16870 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc)

Changes were made to various documents/part numbers due to multiple reasons such as: scanner mounting plate hole mismatch, clearance RJ45 connector too small, hinge pins not sufficiently secured, and clearances too small.

09-29-2011
UNS-16871 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc)

Deleted spacers and changed BOM - the four spacers under the motherboard wer eliminated; therefore, the BOM had to be changed and the assembly drawing revised.

09-29-2011
UNS-16979 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) Pro V&V

OVS 2.0.A (Freedom Vote Tablet)

07-05-2018
UNS-17012 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) Pro V&V

Open Elect Voting Optical (OVO) Ballet Box

10-29-2019
UNS 17050 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) Pro V&V

OpenElect Voting Optical (OVO) 2.2

05-17-2022
UNS 17059 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) Pro V&V

Freedom Vote Scan

07-13-2022
UNS-17110 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) Pro V&V

OpenElect OVO 2.1

08-19-2020
UNS-17111 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) Pro V&V

OpenElect Tabulator Manager module, version 2.1

08-19-2020
UNS-17112 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) Pro V&V

OpenElect Ballot Layout Manager Module, version 2.1

08-19-2020