Skip to main content
Need voter registration information? Visit Vote.gov

UNS-17111

Testing Lab
Impacted Device/System

OpenElect Tabulator Manager module, version 2.1

Date Approved by EAC
08/19/2020
Short Description of Changes

Changes made to three methods so that a bucket is available for all parties defined by
the election in each precinct or split. This was done by creating a full list of a parties defined in the
election and then applying that list to all normal precincts in the election (absentee precincts are
excluded) The previous method for getting parties by precinct what removed, and replaced with a list
(retrieved once) that is applied to all precincts.