Skip to main content
Need voter registration information? Visit Vote.gov

Engineering Change Orders

Tuesday, December 23, 2025
An engineering change order (ECO) is a change to a previously EAC-certified voting system’s hardware, documentation, or data that is minor in nature and effect. ECOs require voting system test laboratory review and endorsement as well as EAC approval. Any proposed change that is not deemed to be a minimal change is a modification and must be submitted for testing and review consistent with the EAC Testing and Certification Program requirements.

Engineering Change Orders

Search by:

Filter by:

Manufacturer

ECO Manufacturer Testing Lab Impacted Device/System Date Approved
LVU-101133 Liberty Vote USA Inc. Pro V&V

Democracy Suite 5.5-C
Democracy Suite 5.5-D
Democracy Suite 5.17
Democracy Suite 5.5-B
Democracy Suite 5.5
Democracy Suite 5.5-A
Democracy Suite 5.20

03-11-2026