| UNS-1001 |
Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) |
|
Made changes to the following parts: 512 MB DDR Memory Module, 80 GB Hard Drive, and USB Flash Drive: DDR Memory Module andHard Drive wer added to the approved list because of being more readily available currently. Flash drive more ESD resistant case was added.
|
05-17-2010 |
| UNS 1025 |
Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) |
Pro V&V |
OpenElect 2.2 |
02-24-2022 |
| UNS 1026 |
Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) |
Pro V&V |
OpenElect 2.2 - Freedom Vote Scan |
02-24-2022 |
| UNS 1027 |
Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) |
Pro V&V |
OpenElect Freedom Vote Scan |
07-26-2022 |
| UNS-1028 |
Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) |
Pro V&V |
FVS
OpenElect 2.2
OpenElect 2.2.3 |
07-06-2023 |
| UNS 1029 |
Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) |
Pro V&V |
FreedomVote Scan (FVS) using OpenElect 2.2 and 2.2.3 |
07-20-2023 |
| UNS 1030 |
Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) |
Pro V&V |
FreedomVote Scan with OpenElect 2.2. and 2.3 |
09-26-2023 |
| UNS-16842 |
Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) |
|
Removed "EAC APPROVED" and moved "UNISYN" logo to center on OVO and OVI label.
|
05-24-2010 |
| UNS-16844 |
Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) |
|
Make changes to BOM and riase Rev. from A to B. The replacement motherboard had been granted a CE Declaration of Conformity for testing that was comparable to that required by the EAC 2005 VVSG.
|
08-22-2011 |
| UNS-16847 |
Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) |
|
Updated AC distribution cable
|
05-24-2010 |
| UNS-16855 |
Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) |
|
Printer, Star TSP743II-24, Serial Interface, Gray, OVI - new flash ROM supplier forced a change to the mainboard and a change to the firmware.
|
11-30-2010 |
| UNS-16856 |
Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) |
|
OVI label change
|
11-30-2010 |
| UNS-16857 |
Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) |
|
Network seal, plate printer mount, bottom chassis, bracket lock/seal cover, hinge chassis - to alleviate interferences and to accomplish an overall better intercomponent fit and easy of assembly.
|
11-30-2010 |
| UNS-16858 |
Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) |
|
Changes in labels for TM and USB flash drive - revision made to documentation for ease of tracking.
|
11-30-2010 |
| UNS-16859 |
Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) |
|
OVI ADA Keypad - wrong base material called out on ADA keypad (Part Number 8063-93018).
|
11-30-2010 |
| UNS-16865 |
Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) |
|
Add missing EAC label - the BOM for the affected units are missing the EAC label.
|
08-26-2011 |
| UNS-16869 |
Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) |
|
Change in motherboard - 2.0GHz motherboard for OVO PC no longer available. Decision made to use the same motherboard for OVO and OVI PC's.
|
05-18-2012 |
| UNS-16870 |
Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) |
|
Changes were made to various documents/part numbers due to multiple reasons such as: scanner mounting plate hole mismatch, clearance RJ45 connector too small, hinge pins not sufficiently secured, and clearances too small.
|
09-29-2011 |
| UNS-16871 |
Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) |
|
Deleted spacers and changed BOM - the four spacers under the motherboard wer eliminated; therefore, the BOM had to be changed and the assembly drawing revised.
|
09-29-2011 |
| UNS-16979 |
Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) |
Pro V&V |
OVS 2.0.A (Freedom Vote Tablet)
|
07-05-2018 |
| UNS-17012 |
Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) |
Pro V&V |
Open Elect Voting Optical (OVO) Ballet Box
|
10-29-2019 |
| UNS 17050 |
Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) |
Pro V&V |
OpenElect Voting Optical (OVO) 2.2 |
05-17-2022 |
| UNS 17059 |
Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) |
Pro V&V |
Freedom Vote Scan |
07-13-2022 |
| UNS-17110 |
Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) |
Pro V&V |
OpenElect OVO 2.1
|
08-19-2020 |
| UNS-17111 |
Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) |
Pro V&V |
OpenElect Tabulator Manager module, version 2.1
|
08-19-2020 |
| UNS-17112 |
Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) |
Pro V&V |
OpenElect Ballot Layout Manager Module, version 2.1
|
08-19-2020 |
| UNS-17113 |
Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) |
Pro V&V |
OpenElect 2.1
|
08-19-2020 |
| UNS-17114 |
Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) |
Pro V&V |
OpenElect OVO 2.1
|
08-19-2020 |
| UNS 17120 |
Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) |
Pro V&V |
OpenElect OCS |
11-22-2021 |
| UNS-2301 |
Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc) |
Pro V&V |
OCS/OVCS
OpenElect 2.1
OpenElect 2.2
OpenElect 2.2.3 |
08-24-2023 |