Skip to main content
Need voter registration information? Visit Vote.gov

UNS-16979

Testing Lab
Impacted Device/System

OVS 2.0.A (Freedom Vote Tablet)

Date Approved by EAC
07/05/2018
Short Description of Changes

This ECO documented a change to the FVT keypad. The change was to physically switch the position and functionality of two buttons on the keypad. It included both changes to the hardware and source of the Open Voting Solution (OVS) version 2.0.A.

Additional Documentation