Skip to main content

Engineering Change Orders

An engineering change order (ECO) is a change to a previously EAC-certified voting system’s hardware, documentation, or data that is minor in nature and effect. ECOs require voting system test laboratory review and endorsement as well as EAC approval. Any proposed change that is not deemed to be a minimal change is a modification and must be submitted for testing and review consistent with the EAC Testing and Certification Program requirements.

Search by:

Filter by:

Manufacturer

ECO Manufacturer Short Name Testing Lab (indexed field) Impacted Device/System (indexed field) Sort descending Date Approved
DVS-100441 Dominion Voting Systems Corp

4.14-D EMS; 4.14-E EMS

11-19-2018
UNS-16865 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc)

Add missing EAC label - the BOM for the affected units are missing the EAC label.

08-26-2011
DVS 100864 Dominion Voting Systems Corp Pro V&V

All D-Suite configurations - Election Management System

07-06-2022
DVS-100596 Dominion Voting Systems Corp Pro V&V

All D-suite EMS using Windows 10

08-20-2019
HRT-01502 Hart InterCivic, Inc. SLI Compliance, a Division of Gaming Laboratories International, LLC

All Verity Devices and Releases

07-12-2022
HRT-01592 Hart InterCivic, Inc. SLI Compliance, a Division of Gaming Laboratories International, LLC

All Verity Devices and Releases.

03-24-2023
HRT-01387 Hart InterCivic, Inc. SLI Global Solutions (formerly SysTest Labs)

All Verity Releases

03-02-2020
ECO-01389 Hart InterCivic, Inc. SLI Compliance, a Division of Gaming Laboratories International, LLC

All Verity releases - circuit board component.

10-02-2020
HRT 01538 Hart InterCivic, Inc. SLI Compliance, a Division of Gaming Laboratories International, LLC

All Verity Voting systems

05-31-2022
UNS-16869 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc)

Change in motherboard - 2.0GHz motherboard for OVO PC no longer available. Decision made to use the same motherboard for OVO and OVI PC's.

05-18-2012
UNS-16858 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc)

Changes in labels for TM and USB flash drive - revision made to documentation for ease of tracking.

11-30-2010
UNS-16870 Unisyn Voting Solutions (a division of International Lottery and Totalizator, Inc)

Changes were made to various documents/part numbers due to multiple reasons such as: scanner mounting plate hole mismatch, clearance RJ45 connector too small, hinge pins not sufficiently secured, and clearances too small.

09-29-2011
HW-1086 Clear Ballot Group, Inc. Pro V&V

ClearAccess component (ClearCount 2.0)

03-18-2020
Clear Ballot SW13406 Clear Ballot Group, Inc. Pro V&V

ClearCast Go Version 2.2.a and ClearCast Model D Version 2.2.9

03-10-2023
HW-880 Clear Ballot Group, Inc. Pro V&V

ClearCount 2.0 (ClearAccess component)

03-23-2020
HW-873 Clear Ballot Group, Inc. Pro V&V

ClearCount and ClearDesign (ClearVote 2.0)

01-31-2020
HW-879 Clear Ballot Group, Inc. Pro V&V

ClearCount Scanner (ClearVote 2.0)

03-23-2020
SW7679 Clear Ballot Group, Inc.

ClearVote 1.5, 2.0, and 2.1 (ClearDesign, ClearAccess, and ClearCount components

08-27-2020
SW-7679 Clear Ballot Group, Inc. Pro V&V

ClearVote 1.5, 2.0

08-27-2020
COTS-13 Clear Ballot Group, Inc. Pro V&V

ClearVote 2.3 DesignStation, CountStation, and ScanStation

05-12-2023
ECO 22-1 Clear Ballot Group, Inc. Pro V&V

ClearVote 2.0 and 2.2

04-18-2022
HW-4211 Clear Ballot Group, Inc. Pro V&V

ClearVote 2.0, ClearVote 2.1, ClearCount 1.6

02-19-2021
CBG-117 Clear Ballot Group, Inc. Pro V&V

ClearVote 2.3 / Dell PowerEdge Server R440

05-05-2023
CBG-194 Clear Ballot Group, Inc. Pro V&V

ClearVote 2.3, EMS

11-22-2022
DVS-100534 Dominion Voting Systems Corp Pro V&V

D-Suite 5.5, 5.5-A, 5.4-NV, 5.4-Complete, 5.4-E, and 5.4-F

03-18-2019
ECO-100718 Dominion Voting Systems Corp Pro V&V

D-Suite 5.5, 5,5-A, 5.5-B, 5.5-C

12-07-2020
ECO-100719 Dominion Voting Systems Corp Pro V&V

D-Suite 5.5, 5,5-A, 5.5-B, 5.5-C

12-07-2020
ECO-100720 Dominion Voting Systems Corp Pro V&V

D-Suite 5.5, 5,5-A, 5.5-B, 5.5-C

12-07-2020
DVS-100543 Dominion Voting Systems Corp Pro V&V

D-Suite: 4.14-D, 4.14-E, 5.0, 5.0-A, 5.5, 5.5-A

03-18-2019
DVS-100762 Dominion Voting Systems Corp Pro V&V


D-Suite  5.5-B, 5.5-C
 

08-18-2021