Skip to main content
Need voter registration information? Visit Vote.gov

Engineering Change Orders

Tuesday, December 23, 2025
An engineering change order (ECO) is a change to a previously EAC-certified voting system’s hardware, documentation, or data that is minor in nature and effect. ECOs require voting system test laboratory review and endorsement as well as EAC approval. Any proposed change that is not deemed to be a minimal change is a modification and must be submitted for testing and review consistent with the EAC Testing and Certification Program requirements.

Engineering Change Orders

Search by:

Filter by:

Manufacturer

ECO Manufacturer Testing Lab Impacted Device/System Date Approved
ESS-1154 Election Systems & Software, Inc (ES&S) Pro V&V

DS300 Ballot Box Scanner for EVS 6.3.0.0.

03-08-2024
ESS-1156 Election Systems & Software, Inc (ES&S) Pro V&V

DS950 Scanner for EVS 6.0.6.0, EVS 6.2.0.0 and EVS 6.3.0.0.

02-14-2024
ESS-1164 Election Systems & Software, Inc (ES&S) Pro V&V

Impacted System:

EVS 6.3.0.0

EVS 6.4.0.0

EVS 6.5.0.0

Impacted Devices:

DS300

10-01-2024
ESS-1165 Election Systems & Software, Inc (ES&S) Pro V&V

Tote Bin DS200/DS300

EVS 5.2.4.0, EVS 6.0.2.0, EVS 6.0.2.1, EVS 6.0.4.0, EVS 6.0.4.3, EVS 6.0.6.0, EVS 6.1.0.0, EVS 6.1.1.0, EVS 6.2.0.0, EVS 6.3.0.0, EVS 6.4.0.0

05-15-2024
ESS-1168 Election Systems & Software, Inc (ES&S) Pro V&V

Expressvote XL on EVS 6.0.0.0, EVS 6.0.2.0, EVS 6.0.2.1, EVS 6.0.3.0, EVS 6.0.4.0, EVS 6.0.4.3, EVS 6.0.6.0, EVS 6.1.0.0, EVS 6.1.1.0, EVS 6.2.0.0, EVS 6.3.0.0, and EVS 6.4.0.0

04-04-2024
ESS-1174 Election Systems & Software, Inc (ES&S) Pro V&V

DS300 Scanner for the EVS 6.3.0.0 and EVS 6.4.0.0

04-03-2024
ESS-1176 Election Systems & Software, Inc (ES&S) Pro V&V

DS850 Scanner using EVS 6.4.0.0 

04-15-2024
ESS-1177 Election Systems & Software, Inc (ES&S) Pro V&V

Add Brother HL-EX415DWVS Printer to DS450 using EVS 6.3.0.0 and EVS 6.4.0.0

04-15-2024
ESS-1178 Election Systems & Software, Inc (ES&S) Pro V&V

Add Brother HL-EX415DWVS Printer to DS950 for EVS 6.0.6.0, EVS 6.2.0.0, EVS 6.3.0.0 and EVS 6.4.0.0

04-15-2024
ESS-1184 Election Systems & Software, Inc (ES&S) Pro V&V

Expressvote XL with EVS 6.0.0.0, EVS 6.0.2.0, EVS 6.0.2.1, EVS 6.0.3.0, EVS 6.0.4.0, EVS 6.0.4.3, EVS 6.0.6.0, EVS 6.1.0.0, EVS 6.1.1.0, EVS 6.2.0.0, EVS 6.3.0.0 and 6.4.0.0.

08-02-2024
ESS-1187 Election Systems & Software, Inc (ES&S) Pro V&V

The DS300 ballot boxes for the:

EVS 6.3.0.0.

EVS 6.4.0.0.

EVS 6.5.0.0.

08-26-2024
ESS-1188 Election Systems & Software, Inc (ES&S) Pro V&V

EVS 6.5.0.0

09-16-2024
ESS ECO-1167 Election Systems & Software, Inc (ES&S) Pro V&V

EVS 6.3.0.0.

04-09-2024