Skip to main content
Need voter registration information? Visit Vote.gov

ESS-1174

Testing Lab
Impacted Device/System

DS300 Scanner for the EVS 6.3.0.0 and EVS 6.4.0.0

Date Approved by EAC
04/03/2024
Short Description of Changes

This ECO introduces a modification to the DS300 thermal report printer door and motor cable bracket. This modification prevents the deformation of the thermal report printer and a larger variation tolerance for the report printer door.

Additional Documentation