Skip to main content
Need voter registration information? Visit Vote.gov

HRT-01619

Manufacturer
Impacted Device/System

Impacted Systems:

Verity 2.7

 

Impacted Devices:

Verity Central

Verity Scan

Verity Scan with Relay

Date Approved by EAC
09/29/2023
Short Description of Changes

This ECO introduces a modification that adjusts the tolerances of landmark detection on Verity ballots. The change alters how the landmark detection algorithm detects the landmark's initial (left) outbound black line.