Skip to main content
Need voter registration information? Visit Vote.gov

HRT-01583

Manufacturer
Impacted Device/System

Touch Writer Duo and Touch Writer Duo Standalone devices

Hart Verity 2.3, 2.3.3, 2.3.4, 2.4, 2.5, 2.6, and 2.7

Date Approved by EAC
02/17/2023
Short Description of Changes

This ECO is created to integrate and track a manufacturer’s revision to the Brother PJ-723 thermal printer, used by Hart within the Verity Touch Writer Duo series devices. The revised thermal printer adds a newer manufacturer’s firmware, and an internal mechanical feature is added that ensures constant firm paper contact with the thermal print head. The revision enhances print speed. The printer is otherwise form, fit, and function compatible to the current PJ-723 thermal printer revision, and is compatible with the Verity Touch Writer Duo software with no changes required. This ECO affects the Verity Touch Writer Duo series devices’ Bills of Materials (BOMs) only, resulting in a revision change to the assemblies for tracking purposes. There are no changes to other Verity devices or workstation software.