Skip to main content
Need voter registration information? Visit Vote.gov

HRT-01390

Manufacturer
Impacted Device/System

Verity Relay Kit Modem

Date Approved by EAC
03/27/2020
Short Description of Changes

The COTS 4G "Cellular Dongle" USB modem used in the Verity relay kit has been revised by the manufacturer, MultiTech. The metal shielding on the USB cable is now grounded (soldered) to the circuit board inside the modem enclosure to improve EMC performanc