Skip to main content
Need voter registration information? Visit Vote.gov

Hart-01512

Manufacturer
Impacted Device/System

Verity Voting 1.0, 2.0, 2.2 Mod, 2.2.1, 2.2.2, 2.3, 2.3.3, 2.3.4, 2.4, 2.6 Systems

Date Approved by EAC
02/04/2022
Short Description of Changes

ECO-01512 makes several clarifying clerical updates and adds an additional construction

method for an existing internal device cable. There are no changes to the production Verity device

assemblies.

The following changes are made in this ECO:

Clerical Verity Duo series baseboards correction. A duplicate reference designator is removed.

Three cable drawings are updated to clarify that any connector tooling points are to be covered.

An alternate construction method for an internal cable is provided.