Skip to main content
Need voter registration information? Visit Vote.gov

Hart-01496

Manufacturer
Impacted Device/System

Verity Voting 2.3, 2.4, 2.5, 2.6 Systems

Date Approved by EAC
09/13/2021
Short Description of Changes

This ECO modifies a power regulator circuit design on the Verity Touch Writer Duo series baseboards to move away from the Linear Tech LT8711 power controller and instead use the more wisely available Texas Instruments (TI) TPS552882 series part.

The modification describe on this ECO is functionally identical to existing baseboards and does not require any change to software.