Skip to main content
Need voter registration information? Visit Vote.gov

HRT-01551

Manufacturer
Impacted Device/System

Verity Controller and Verity Touch Duo using Verity Voting 2.5

Date Approved by EAC
08/24/2022
Short Description of Changes

This ECO eliminates the cause of extended set up time during Verity Touch Writer Duo (Touch Duo) booth assignment, performed during equipment setup at the polling place.