Skip to main content
Need voter registration information? Visit Vote.gov

HRT-01446

Manufacturer
Impacted Device/System

System(s): Verity 2.3, 2.4, 2.5, 2.6

Products: Verity Duo Go, Verity Touch Writer Duo Standalone,

Verity SmartPanel, Widows 10 License Label

Date Approved by EAC
05/19/2021
Short Description of Changes

Clerical updates and corrections to manufacturing documentation to

Verity devices, including the Approved Manufacturer Lists (AMLs) and Bills of Material (BOMs), and makes

updates to labels. The following changes are made in this ECO: Clerical Verity Duo BOM corrections, The “EAC Certified” logo is added to the Verity Touch Writer Duo Standalone device (Note: the Duo Go assembly and tablet will not carry the "EAC Certified" logo), A clerical part number update is made to the Smart Panel electronics, An orderable part number is added to the Window 10 license label Item.