Skip to main content
Need voter registration information? Visit Vote.gov

CBG-CV25-6

Testing Lab
Impacted Device/System

ClearVote 2.5

Date Approved by EAC
01/16/2026
Short Description of Changes

This ECO documents a minor change order request to ClearVote 2.5 to add a reconfigured ATA Case for use with ClearMark. The Ballot Verification Scanner peripheral was removed from the ClearVote 2.5 campaign during testing. Removal of this peripheral device means that the current ATA Case configuration with the access door to the Ballot Verification Scanner is no longer needed. Replacing the existing opening with a solid side wall and adding an internal shelf will increase security of the case by limiting access.

Additional Documentation