Skip to main content
Need voter registration information? Visit Vote.gov

HRT-01764

Manufacturer
Impacted Device/System

Verity Voting
2.3, 2.3.3, 2.3.4, 2.4, 2.5, 2.6, 2.7, 2.7.8, 2.8
(Vanguard Boost and Vanguard Flex)

Verity Vanguard
1.0, 1.1
(Verity Duo and Vanguard Flex)

Date Approved by EAC
07/15/2026
Short Description of Changes

This ECO involves a minor change resulting from the end-of-life status of the thermal paper and paper stock used for VotePass tickets (Vanguard Boost and Vanguard Flex) and Printed Vote Records (PVR) ballots (Verity Duo and Vanguard Flex). Based on the information provided, this change does not alter the system's reliability, functionality, capability, or operation. Accordingly, the EAC has determined that no further testing is necessary.

Additional Documentation
HARTEC~1.PDF (332.34 KB)