Skip to main content
Need voter registration information? Visit Vote.gov

ESS ECO-1160

Testing Lab
Impacted Device/System

Delkin 3.0 USB Flash Drive (4GB, 8GB) models 6206 and 6207; EVS 5.2.0.3.

Date Approved by EAC
12/07/2023
Short Description of Changes

This ECO added equivalent source USB devices due to the original USB devices end-of-life production. The new USB devices (Delkin 3.0 USB Flash Drive (4GB, 8GB) models 6206 and 6207) were previously tested during EAC certification test campaigns. This minor change does not alter the system’s reliability, functionality, capability, or operation. Based on the information provided, it has been determined that no further testing is necessary.

Additional Documentation