Manufacturer
Testing Lab
Impacted Device/System
EVS 6.3.0.0
EVS 6.4.0.0
EVS 6.5.0.0
Date Submitted by Manufacturer
08/28/2026
Date Approved by EAC
08/31/2026
Short Description of Changes
This minor change adds an improved plug adhesive and screws for the DS300 display bezel to prevent adhesive failure and the loosening of rubber stoppers.