ESS-1198

Testing Lab
Impacted Device/System

EVS 5.2.4.0

EVS 6.5.0.0

Date Approved by EAC
07/07/2025
Short Description of Changes

This minor change requires creating a new lock pawl for DS300 Ballot Box and adhesive stop plate for DS200 Base, This is due to the DS200 Ballot Box 98-00074 and DS200 Carry Case 98-00045 reaching end-of-life, and the supplier is unable to continue production of the assembly due to condition of tooling. It does not alter the system’s reliability, functionality, capability, or operation.