Skip to main content
Need voter registration information? Visit Vote.gov

ESS-1186

Testing Lab
Impacted Device/System

EVS 6.4.0.0, EVS 6.3.0.0 , EVS 6.5.0.0 

Date Approved by EAC
04/23/2025
Short Description of Changes

This minor change introduces a change to the seal lock loop rivet of the DS300 Ballot Box and does not alter the system’s reliability, functionality, capability, or operation. Based on the information provided, it has been determined that no further testing is necessary. 

Additional Documentation