Skip to main content
Need voter registration information? Visit Vote.gov

ESS 1185

Testing Lab
Impacted Device/System

EVS 5.2.0.0, EVS 5.2.0.3, EVS 5.2.0.4, EVS 5.2.1.0, EVS 5.2.1.1, EVS 5.2.2.0, EVS 5.2.3.0, EVS 5.2.4.0, EVS 5.4.0.0, EVS 5.4.1.0, EVS 6.0.0.0, EVS 6.0.2.0, EVS 6.0.2.1, EVS 6.0.3.0, EVS 6.0.4.0, EVS 6.0.4.3, EVS 6.0.6.0, EVS 6.1.0.0, EVS 6.1.1.0, EVS 6.2.0.0, EVS 6.3.0.0, EVS 6.4.0.0, and EVS 6.5.0.0

Date Approved by EAC
04/29/2025
Short Description of Changes

This minor change includes a new replacement motor mount assembly bracket that will be mounted to the existing Paper Path Motor (PPM) side panel (using existing mounting holes) eliminating the need to replace the entire side panel and does not alter the system’s reliability, functionality, capability, or operation.

Additional Documentation