DVS-101047

Testing Lab
Impacted Device/System

Cisco 8-Port Managed Switch (C1300-8T-E-2G) for Democracy Suite 5.17 & Democracy Suite 5.20

Date Approved by EAC
08/07/2025
Short Description of Changes

This updated Engineering Change Order (ECO) supersedes the original submission of DVS-101047 and incorporates revised documentation and VSTL analysis to correct clerical errors and omissions. The change involves replacing the commercially unavailable Cisco CBS350-8T-E-2G with the Cisco 8-Port Managed Switch (C1300-8T-E-2G) as a new COTS component. All VSTL revisions (Rev. 00 through Rev. 02) are posted for full transparency. These updates are clerical in nature and do not impact the system’s reliability, functionality, capability, or operation.