Manufacturer
Testing Lab
Impacted Device/System
ClearVote 2.5
Date Submitted by Manufacturer
Date Approved by EAC
Short Description of Changes
This minor change enables the ClearCast Go software to utilize the status output of the existing Ultrasonic Sensor (USS) so the feature can be used during the November 2026 General Election. The USS hardware component was already included in the certified ClearVote 2.5 voting system but was disabled during testing.